LFR website header mark projection v0.1 The frozen canonical centrelines rendered with a 16 source-pixel body for 40 to 64 CSS pixel website-header use. {"body_width_source_pixels":16.0,"claim_boundary":"Declared website-header application projection; not canonical geometry or favicon authority.","schema":"lfr_website_header_mark_projection_v0_1","source":"canonical_generative_state_v0.1.svg","source_sha256":"7731103E48C5BDEB68CCF4D5D059B4CA83C2BDCB82C954228EBFE5A09E3C4087","status":"APPLICATION_PROJECTION_40_TO_64_CSS_PX_ONLY","taper_degrees":28.0,"valid_css_px":[40,64]}
LFR Resonance Systems
GB grid public-duty observation · lfrfrequency.com
Grid Continuity Status Card

Supply records and accepted balancing actions in GB

BOALF window · [2026-08-08, 2026-09-07) (30 complete UTC days; last included date 2026-09-06)
GB · 2026-09-07
PUBLIC OBSERVATION
system-level · zero named units

Recorded supply

Transmission-level FUELHH supply shares, including interconnector imports and net pumping; solar and embedded generation are not included. The denominator is total recorded FUELHH supply, not BOALF actions.

FUELHH source-window label: 30d. Exact dates are not carried by this reading; it does not inherit the BOALF dates above.

Gas
27.1%
Wind
26.6%
Nuclear
18.7%
Interconnect
12.5%

Accepted-action records

Two measures for the same defined BM-unit group with high-confidence storage classification.

Accepted-action count
34.2%
Instructed-trajectory energy
3.8%

Share of all accepted actions; share of all instructed-trajectory MWh. Different denominators and units: not additive, subtractable or interchangeable. Trajectory MWh is not settlement-metered delivery. This group is not a census of every GB battery asset.

Accepted-action count distribution

Accepted actions were distributed across the observed BM-unit population as follows.

Concentration-equivalent count (1/HHI)
160
BM-unit identifiers with accepted actions
515

The concentration-equivalent count is 1/HHI over identifier-level accepted-action shares, not a count of an identified subset. It does not establish ownership diversity, operational resilience or physical redundancy.

Public visibility boundary

Visible in this projection
  • Transmission-level supply categories.
  • Accepted-action count and instructed-trajectory energy under named public procedures.
  • Distribution across BM-unit identifiers in the accepted-action record.
Not established here
  • Individual asset delivery, BMS or SCADA state.
  • A complete identity census of GB battery assets.
  • Dispatch causality, condition, reliability, credit or future outcome.